- Resource
- Case Study
- Turntide Smart Motor System
McDonald’s Franchise Owner Case Study
McDonald’s 5 store rollout reaches payback in just 1.26 years.
- 15-motor rollout
- 5 McDonald’s locations
- $23,712 annual energy bill savings
- 58% motor energy savings
- 111,121 kWh savings per year